In November 2024, I started building a small switching shelf layout based on the Southern Pacific Burbank Branch in San Fernando Valley, California, set in the 1970s.
The layout is focused on realistic operations. Given my limited hobby time and the space constraints, I decided to model a slow-paced branch line that can keep up to two operators engaged for a little over an hour.
Here is the (draft) trackplan.

I started building the benchwork by securing brackets to the wall and attaching the valance/ceiling. Next, I installed Masonite boards for the backdrop and painted them light blue.

The layout is focused on realistic operations. Given my limited hobby time and the space constraints, I decided to model a slow-paced branch line that can keep up to two operators engaged for a little over an hour.
Here is the (draft) trackplan.
I started building the benchwork by securing brackets to the wall and attaching the valance/ceiling. Next, I installed Masonite boards for the backdrop and painted them light blue.
Comment