The SPIE RR idea came about from a suggestion of a friend many years after dismantling my SPIDGE RR. Southern Pacific in Dad's Garage. I am the Dad. I ran on that roughly from 2004 to 2014 when I began modifying the layout for longer trains. Deep into it I decided to just start over. After many years and iterations I settled on a rough footprint and operational theme. Construction began Jan 2023.
A few items that I hope to include;
Yard ops
A busy mainline
Plenty of switching for locals
Continuous staging for automatically resetting of trains
Long trains
No stacked switching areas or control traffic through scheduling to avoid operator congestion
Walk in design
High track elevation for a better view
Leave some space for a workbench
Area specific details to gain the flavor of the locations depicted
Here is a rough footprint, but it has changed from this a bit.

A few items that I hope to include;
Yard ops
A busy mainline
Plenty of switching for locals
Continuous staging for automatically resetting of trains
Long trains
No stacked switching areas or control traffic through scheduling to avoid operator congestion
Walk in design
High track elevation for a better view
Leave some space for a workbench
Area specific details to gain the flavor of the locations depicted
Here is a rough footprint, but it has changed from this a bit.
Comment